Renovation of Otemachi Building
Renovation of Otemachi Building
The small column spans and long corridors from when the building was completed (1958) have been adapted to meet the current demands of small offices for startups and other businesses, with efforts aimed at extending the building's lifespan by improving facade, interior design of common areas, strengthening basement retail facilities, and utilizing the rooftop. facade frame was constructed separately from the outside and the inside (tenant-only areas), allowing for "renovations while the tenants are still living in the building" to suit the needs of the tenants. Different materials have been used to create different scenery on each street across the 200m long volume. The plan is to convert the characteristics of the existing stock into value and update both the hardware and software aspects.
DATA
| Year of completion | 1958 |
|---|---|
| Renovation/Renewal | 2020 |
| Location | Chiyoda ward, Tokyo |
| Building usage | Offices, commercial facilities |
| Site area | 10,496㎡ |
| Total floor area | 111,272㎡ |
| Scale | 9 floors above ground, 3 floors below ground, 2 floors in the penthouse |
| structure | SRC Construction |
| Details of the Award | ・ JIA Architects of the Year 2023 (The Japan Institute of Architects (JIA)/Japan) ・ JAPAN WOOD DESIGN AWARD 2022, Architecture & Space Segment, Heartful Design Category (Japan Wood Design Association /Japan) ・GOOD DESIGN AWARD 2021 (Japan Institute of Design Promotion (JDP) /Japan) View More |
| Our Business | Renovation, design, and Construction Supervision |
| Related Links | SKY LAB, Roof Top Of Otemachi Building |
Update : 2023.02.02