This overhead walkway was planned between the bus stop and the store site to resolve the issue of road crossings, which had been a concern for facility operation from the perspective of easing congestion and ensuring the safety of visitors. The bridge abutments make use of the terrain to keep the bridge section to a minimum, and a simple and economical plate girder format was made possible, which resulted in a short construction period of just under one year from the start of design to completion, at low cost, while the decorative panels, sprayed stone finish, and balustrades allow for harmony with the existing store design.

DATA

Year of completion2019
locationTosu City, Saga Prefecture

Google map

ApplicationsRoads and Bridges
structureSuperstructure: Simple non-composite plate girder bridge / Substructure: RC abutment (parking lot side), RC abutment with stairs (store side)
Our BusinessCivil architectural design and construction supervision
full lengthApproximately 33m (including bridge section approximately 18m)
Width3.5m
Related LinksTosu Premium Outlet