"Airport North Side Cargo Facility Development Construction" Requirement Specification Creation Work
Creation of requirements specifications etc. for selecting a design and construction contractor. After being selected through an open competitive bidding process, we conducted an on-site survey and created concept design, rough budget, schedule, rolling plan etc. for the new construction. We compiled these into a "requirements specification" that organized the given conditions (design conditions and construction conditions) for selecting a design and construction contractor.
DATA
| Year of completion | 2020 |
|---|---|
| Location | Narita City, Chiba Prefecture (inside Narita International Airport) |
| Building usage | Public, Culture and Sports |
| Site area | 1,401,882㎡ (total airport area as of January 2020) |
| Total floor area | 6,386.92㎡ |
| Scale | 2nd floor above ground |
| structure | Steel |
| Our Business | CM (Construction Management), concept design |
| CM Contents | Standard CM + concept design |
| photograph | Provided by: Narita International Airport Corporation |
Update : 2021.12.04