PROJECTS

Ashigarakami Joint Government Building Main Building Construction

Ashigarakami Government Office

As part of the Kanagawa Prefecture Emergency Financial Measures, this project was the first in the prefecture to adopt the CM + Design and Construction Lump Sum Ordering Method (DB). We verified a method that is expected to shorten construction time and reduce costs through technical proposals from the design and construction contractor. We selected the design and construction contractor based on concept design and required standards created by our company. After schematic design we acted as the supervisor (CM) to support the client at schematic design stage, design development stage, and construction stage.

DATA

Year of completion2017
locationKaisei Town, Ashigara District, Kanagawa Prefecture

Google map

ApplicationsPublic, Culture and Sports
Site areaApproximately 34,700㎡
Total floor areaApproximately 8,900㎡
Floor number5 floors above ground
structureRC construction, some S construction (beams)/(seismic isolation structure)
Details of the Award

・ Construction Management Commendation Construction Management Commendation 2020 (Construction Management Association of Japan)

View More
Our BusinessCM (Construction Management), concept design
CM ContentsPublic CM (+ concept design)

Update : 2022.02.15