PROJECTS

Shakujii Sports Center

Shakujii Sports Center

Plans to rebuild the sports facility located on the same site.
In order to ensure the necessary ceiling height for the arena, kendo hall, gym, lounge, etc., different volumes are arranged around the arena. Each has a different facade finish to create a diverse appearance, and the air conditioning and lighting plans are tailored to the characteristics of the sport. A circular wheel-type string beam structure was developed and adopted for the roof of the square-plan arena.

DATA

Year of completion2018
locationNerima Ward, Tokyo
ApplicationsPublic, Culture and Sports
Site area8,465 m²
Total floor area3,667 m²
Floor number2 floors above ground, 1 floor below ground
structureRC construction, partly S construction
Our BusinessDesign and Construction Supervision

Update : 2021.12.17

Tags

PAGE TOP