PROJECTS

Douyin Group Chengdu (ByteDance Chengdu)

ByteDance Chengdu

This office park project will be the final piece of the puzzle along Tianfu Boulevard, the city axis of the Tianfu New District in Chengdu, China, where IT companies are concentrated.
By opening up offices, which tend to be closed off, to the local community, we aimed to harmonize with the surrounding environment, drive the region's future, and become a vibrant hub. The two new buildings, which are parallel to the existing low-rise building, have stepped heights, forming a skyline that follows the city axis. A bridge connects the old and new buildings from the sky lobby on the third floor, creating a three-dimensional network that allows direct access to the hall and visitor center. At the top of the building, we have created a 24m-high, four-story atrium for employee interaction. This glass box will become a symbol that shines a light on this developing region.

DATA

Year of completion2024
Site LocationChina
Building usage office
Site area17,600.14㎡
Total floor area112,809.92㎡
Scale16 floors above ground, 3 floors below ground
structureRC construction, partly S construction
Details of the Award

・GOOD DESIGN AWARD 2025 (Japan Institute of Design Promotion (JDP) /Japan)

View More
Our BusinessDesign, design development, Construction Supervision
photographSANQIAN VISUAL IMAGE ART

A 24m-high, four-story atrium employee interaction space that will become an icon of the region
The existing building and the two new buildings will be connected by a three-dimensional network called the "Sky Lobby."

The foyer of the multipurpose hall overlooks the sunken garden between the buildings. A sky lobby runs through the interior.
Employee interaction space. The office was designed to promote high productivity by providing a clear balance between concentration and rest.

Update : 2025.10.14

Tags

PAGE TOP